Portfolio

KVMRT Line 1, Kajang to Sungai Buloh

CONSTRUCTION PERIOD:
LOCATION:
INVESTOR:
CATEGORY:

2013-2017
KUALA LUMPUR, MALAYSIA
MRTCORP
WATERPROOFING

We are proud to participate in the construction of the MRT infrastructure project in Malaysia since year 2013. We were selected by our clients to carry out the installation of the waterproofing system for underground stations and this include high traffic Bukit Bintang Station, National Museum Station, Pasar Seni Station and Semantan North Portal. Our works include polyurea application for the station roof, basement slab waterproofing, injection using polyurethane and acrylic gel resin and others related structural repair works.

Project Challenges

We managed to overcome stringent quality requirement on every aspects of the waterproofing work that we were tasked to do at the job site on a daily basis. On top of that, high safety standard at the job site has enabled us to instill a high performance work culture for our workmen at the site due to stringent requirement. It allows us to bring our work quality to the highest level as there is no room for sub-standard workmanship in this kind of project. Those years of enduring the stress and fast track completion have proofed to be a valuable in the development of our engineering capabilities and human capitals.

Project Results

We are satisfied with our achievement in this project as our team was able to mitigate the issues for our clients through our expertise and to provide our clients with the best advice when it comes to waterproofing and concrete repair aspects of the work.

X